Tacnalfa ha worked to the wellhead project for the Radicondoli 7 wellhead plant, developping the following activities:

  • 3D DESIGN FOR A 360° CONTROL
  • FEASIBILITY STUDY, ACCESSIBILITY, INTERFERENCE CHECKS
  • DRESSING ACCORDING TO CUSTOMIZED SPECIFICATIONS
  • VALIDATION  OF PIPING ROUTING WITH MORE ADVANCED COMPUTER SOFTWARES



                



    Back to projects